PROJECT OVERVIEW
Sealy, Texas
SuperA Power served as the electrical subcontractor for the expansion and remodeling of a photovoltaic mounting structure manufacturing facility in Sealy, Texas.
- Facility size
- 640,000 sq ft
- SuperA Power role
- Electrical subcontractor
SCOPE OF WORK
From infrastructure
to energization.
- ✓Expansion and upgrade of MV electrical distribution systems
- ✓Transformer installation and capacity expansion
- ✓Main switchgear and distribution panel installation
- ✓Power supply and integration for production equipment and manufacturing lines
- ✓Cable tray installation and feeder routing throughout the facility
- ✓Grounding and bonding system installation
- ✓Facility lighting and general power distribution
- ✓Electrical testing, inspection and support for energization
- ✓Coordination with the general contractor and equipment vendors for installation and commissioning